Facility Scheduler V. 5.1 B
Released 5/23/07
Events
• Corrected problem in which altering an existing event scheduled for multiple facilities was causing old events to also change.
• Corrected problem with an event name being changed if you were using multiple facilities.
Other
• Corrected problem where the right-click help files were not installed when Facility Scheduler was installed.